Vermont v. Gillard

by
Defendants appealed their convictions for unlawful trespass. Green Mountain Power Corporation (GMP) is an electric utility that operates several wind-power sites throughout Vermont. Construction required cutting trees, excavating, and blasting rock to produce a "crane road" on which the turbines could be erected by crane. Because a portion of the crane road would be within 100 feet of the GMP's leased property's boundary line, some blast safety zones actually extended into neighboring land owned by Donald and Shirley Nelson, who strongly opposed the project. The Nelsons allowed a group to protest the wind-power site by setting up camp on the portion of the Nelsons' land that fell within a blast safety zone. This prompted GMP and its blasting subcontractor to increase their safety measures, risking a delay of construction of more than five weeks and threatening GMP's eligibility for the federal tax credits. In Fall 2011, GMP initiated a civil suit against the Nelsons for nuisance and interference with contract. While the suit was pending, Defendants passed through an existing property line and entered a portion of the crane-road construction site located on land disputed by the Nelsons and GMP. GMP halted construction, and a representative asked defendants to leave. Although aware of the boundary dispute, defendants refused to leave, claiming permission from the Nelsons, who they maintained owned the disputed land. GMP then contacted local police, who arrived at the scene and asked defendants to leave. Defendants again refused and were arrested. Upon review, the Supreme Court concluded that the trial court did not abuse its discretion by not dismissing the case in the interests of justice. View "Vermont v. Gillard" on Justia Law